Original Ontario Line price only didn’t include all costs: Metrolinx CEO

The 15-kilometre transit line has ballooned in price from the original $10.9 billion for construction to $27.2 billion to build, maintain and operate the trains for 30 years.

Original Ontario Line price only didn’t include all costs: Metrolinx CEO
The 15-kilometre transit line has ballooned in price from the original $10.9 billion for construction to $27.2 billion to build, maintain and operate the trains for 30 years.