This community rain garden 'worked perfectly' during B.C.'s most recent atmospheric river
When it's done, the four-block project will be able to drain 17,000 cubic metres of water per year from the roadway — as much water as approximately seven Olympic-sized swimming pools.
When it's done, the four-block project will be able to drain 17,000 cubic metres of water per year from the roadway — as much water as approximately seven Olympic-sized swimming pools.